Hannes Lagger
- Design and construction of station caverns – Melbourne Metro Tunnel Project. Dans: Geomechanics and Tunnelling, v. 16, n. 6 (novembre 2023). (2023):
- Artificial Ground Freezing of Fully Saturated Soil: Thermal Problem. Dans: Journal of Engineering Mechanics (ASCE), v. 131, n. 2 (février 2005). (2005):