Gabriel Kubieniec
- Planung und Herstellung des Stahlüberbaus der Hochmoselbrücke. Dans: Bautechnik, v. 96 (octobre 2019). (2019):
- Implementation of Longitudinal Welding Stresses Into Structural Calculation of Steel Structures. Dans: Journal of Civil Engineering and Management, v. 22, n. 1 (décembre 2015). (2015):
- Plate Girders With Corrugated Webs. Dans: Journal of Civil Engineering and Management, v. 16, n. 2 (juin 2010). (2010):
- Adhesives In Strengthening of Steel Structures. Dans: Engineering Structures and Technologies, v. 2, n. 2 (juin 2010). (2010):
- (2017): The Observation Point "Wolkenhain" - Bridge as well as Tower: A New Landmark in Berlin. Présenté pendant: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin).