Yukinori Koyama
- Improvement of URT Construction Method. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1991, n. 427 (mars 1991). (1991):
- Considerations In Tunnel-ground Interaction For Shield Tunnel Design. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1995, n. 511 (mars 1995). (1995):
- Development and on Site Application of Inspection System Using Light Wave Camera with Built-in Crack Scale. Dans: Journal of Applied Computing in Civil Engineering, v. 17 ( 2008). (2008):
- クラックスケール内蔵光波測量器を用いたひび割れ点検システムの開発と現場適用 (Development and On Site Application of Inspection System Utilizing Non-prism Total Station Incorporating Crack Width Ruler). Dans: Journal of Applied Computing in Civil Engineering, v. 16 ( 2007). (2007):
- Status of tunnels and tunnelling in Japan. Dans: Tunnelling and Underground Space Technology, v. 18, n. 2-3 (avril 2003). (2003):
- Present status and technology of shield tunneling method in Japan. Dans: Tunnelling and Underground Space Technology, v. 18, n. 2-3 (avril 2003). (2003):