Brian M. Kleiner
- Experimental field testing of a real-time construction hazard identification and transmission technique. Dans: Construction Management and Economics, v. 32, n. 10 (octobre 2014). (2014):
- Psychological Antecedents of Risk-Taking Behavior in Construction. Dans: Journal of Construction Engineering and Management, v. 140, n. 11 (novembre 2014). (2014):
- Enhancing Construction Hazard Recognition and Communication with Energy-Based Cognitive Mnemonics and Safety Meeting Maturity Model: Multiple Baseline Study. Dans: Journal of Construction Engineering and Management, v. 140, n. 2 (février 2014). (2014):
- Design, Development, and Deployment of a Rapid Universal Safety and Health System for Construction. Dans: Journal of Construction Engineering and Management, v. 134, n. 4 (avril 2008). (2008):
- Decision-Making Chains in Electrical Safety for Construction Workers. Dans: Journal of Construction Engineering and Management, v. 142, n. 1 (janvier 2016). (2016):
- Sociotechnical Systems of Fatal Electrical Injuries in the Construction Industry. Dans: Journal of Construction Engineering and Management, v. 142, n. 1 (janvier 2016). (2016):
- Multiple Baseline Testing: Experimental Method for Drawing Causal Inferences in Construction Engineering and Management Research. Dans: Journal of Construction Engineering and Management, v. 141, n. 7 (juillet 2015). (2015):