Johannes Kleberger
- Cetin Dam – stabilising troubled abutment slopes. Dans: Geomechanics and Tunnelling, v. 17, n. 3 (avril 2024). (2024):
- Tools for optimizing rock mass grouting. Dans: Geomechanics and Tunnelling, v. 12, n. 2 (avril 2019). (2019):
- Development of a High-Value Geological Model for Cavern Design in Faulted Rock Mass. Dans: Felsbau, v. 24, n. 5 ( 2006). (2006):