K. Kirikawa
- Replacement of RC Slab with Precast Prestressed Concrete Slab at MICHITANIDAINI BRIDGE of Chugoku Expressway under the Condition of Open to Traffic. Dans: Concrete Journal (JCI), v. 55, n. 6 ( 2017). (2017):
- Evaluation and new design proposal for concrete arch bridges with filled and wrapped steel tubes. Présenté pendant: ARCH'01. 3ème conférence sur les ponts en arc. (2001):