Yong-Su Kim
- 영구임대주택의 현금흐름을 고려한 리모델링 시기 추정에 관한 연구 (The Prediction of Remodelling Timing Based on the Cash Flow of Permanent Rental Housing). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 4, n. 4 (décembre 2004). (2004):
- LCC기법을 이용한 신기술 환기시스템의 경제성 분석에 관한 사례연구 (A Case Study on the Economic Analysis for a New Technology-Based Ventilation System Using LCC Technique). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 4, n. 4 (décembre 2004). (2004):
- Attitudes of Engineers Related to Prevention of Change Order Claims. Dans: Journal of Asian Architecture and Building Engineering, v. 9, n. 1 (mai 2010). (2010):
- Analysis of probabilistic maintenance cost variation ranges through surveys of maintenance cycles/maintenance cost ratios for wastewater treatment plants. Dans: KSCE Journal of Civil Engineering, v. 18, n. 1 (novembre 2013). (2013):
- Development of a model for risk and cost analysis in overseas plant construction projects focusing on petrochemical plant construction projects. Dans: KSCE Journal of Civil Engineering, v. 21, n. 5 (août 2016). (2016):
- Analysis of the probabilistic cost variation ranges according to the effect of core quantitative risk factors for an overseas plant project: Focused on a Middle East gas plant project. Dans: KSCE Journal of Civil Engineering, v. 20, n. 2 (avril 2015). (2015):
- Performance indices for quantitative measurement of R&D results in private construction companies. Dans: KSCE Journal of Civil Engineering, v. 19, n. 4 (février 2015). (2015):
- Major Accident Factors for Effective Safety Management of Highway Construction Projects. Dans: Journal of Construction Engineering and Management, v. 139, n. 6 (juin 2013). (2013):
- (2018): Reanalysis of Modified Structures by Adding or Removing Substructures. Dans: Advances in Civil Engineering, v. 2018 ( 2018).