Sung-Keun Kim
- (2020): BIM performance assessment system using a K-means clustering algorithm. Dans: Journal of Asian Architecture and Building Engineering, v. 20, n. 1 (juin 2020).
- Construction Robot Path-Planning for Earthwork Operations. Dans: Journal of Computing in Civil Engineering, v. 17, n. 2 (avril 2003). (2003):
- Developing an active resource allocation algorithm considering resource supply and demand in a construction site. Dans: KSCE Journal of Civil Engineering, v. 19, n. 1 (juillet 2014). (2014):
- Impacts of geographical location and construction type on as-built roughness in highway pavement construction. Dans: KSCE Journal of Civil Engineering, v. 9, n. 6 (novembre 2005). (2005):
- Improvement of Realism of 4D Objects Using Augmented Reality Objects and Actual Images of a Construction Site. Dans: KSCE Journal of Civil Engineering, v. 22, n. 8 (novembre 2017). (2017):
- Development of an automated machine for PHC pile head grinding and crushing work. Dans: Automation in Construction, v. 18, n. 6 (octobre 2009). (2009):
- GA-based algorithm for selecting optimal repair and rehabilitation methods for reinforced concrete (RC) bridge decks. Dans: Automation in Construction, v. 16, n. 2 (mars 2007). (2007):
- Development of a 4D object-based system for visualizing the risk information of construction projects. Dans: Automation in Construction, v. 31 (mai 2013). (2013):
- A simulation approach for a periodic PCR buffer allocation strategy in organizational program management. Dans: Automation in Construction, v. 20, n. 8 (décembre 2011). (2011):
- Intelligent navigation strategies for an automated earthwork system. Dans: Automation in Construction, v. 21 (janvier 2012). (2012):
- Framework for an intelligent earthwork system [Part II]. Task identification/scheduling and resource allocation methodology. Dans: Automation in Construction, v. 12, n. 1 (janvier 2003). (2003):
- Framework for an intelligent earthwork system [Part I]. System architecture. Dans: Automation in Construction, v. 12, n. 1 (janvier 2003). (2003):
- Task planner design for an automated excavation system. Dans: Automation in Construction, v. 20, n. 7 (novembre 2011). (2011):
- Managing construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation. Dans: Automation in Construction, v. 68 (août 2016). (2016):