0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Khanh, Ha Duy / Kim, Soo-Yong (2020): Exploring Productivity of Concrete Truck for Multistory Building Projects Using Discrete Event Simulation. Dans: KSCE Journal of Civil Engineering, v. 24, n. 12 (septembre 2020).

    https://doi.org/10.1007/s12205-020-1389-z

  2. Pham, Hai / Luu, Truong-Van / Kim, Soo-Yong / Vien, Duc-Thinh (2020): Assessing the Impact of Cost Overrun Causes in Transmission Lines Construction Projects. Dans: KSCE Journal of Civil Engineering, v. 24, n. 4 (mars 2020).

    https://doi.org/10.1007/s12205-020-1391-5

  3. Kim, Soo-Yong / Lee, Yeon-San / Viet Thanh, Nguyen / Luu -Truong, Van (2016): Barriers to Applying Value Management in the Vietnamese Construction Industry. Dans: Journal of Construction in Developing Countries, v. 21, n. 2 ( 2016).

    https://doi.org/10.21315/jcdc2016.21.2.4

  4. Dang, Chau Ngoc / Le-Hoai, Long / Kim, Soo-Yong / Van Nguyen, Chau / Lee, Young-Dai / Lee, Sun-Ho (2017): Identification of risk patterns in Vietnamese road and bridge construction. Contractor's perspective. Dans: Built Environment Project and Asset Management, v. 7, n. 1 (février 2017).

    https://doi.org/10.1108/bepam-11-2015-0065

  5. Kim, Soo-Yong / Tuan, Kiet Nguyen / Luu, Van Truong (2015): Delay factor analysis for hospital projects in Vietnam. Dans: KSCE Journal of Civil Engineering, v. 20, n. 2 (avril 2015).

    https://doi.org/10.1007/s12205-015-0316-1

  6. Kim, Soo-Yong / Tuan, Kiet Nguyen / Lee, Jae Do / Pham, Hai / Luu, Van Truong (2017): Cost overrun factor analysis for hospital projects in Vietnam. Dans: KSCE Journal of Civil Engineering, v. 22, n. 1 (avril 2017).

    https://doi.org/10.1007/s12205-017-0947-5

  7. Kim, Ki-Shin / Kim, Soo-Yong / Kim, Dae Young / Huh, Young-Ki (2016): Multivariate discriminant analysis for assessing residential development projects from a contractor's perspective. Dans: KSCE Journal of Civil Engineering, v. 21, n. 4 (juillet 2016).

    https://doi.org/10.1007/s12205-016-0783-z

  8. Kim, Soo-Yong / Nguyen, Viet Thanh (2017): An AHP Framework for Evaluating Construction Supply Chain Relationships. Dans: KSCE Journal of Civil Engineering, v. 22, n. 5 (août 2017).

    https://doi.org/10.1007/s12205-017-1546-1

  9. Van Luu, Truong / Kim, Soo-Yong / Truong, Trinh-Quan / Ogunlana, Stephen O. (2009): Quality improvement of apartment projects using fuzzy-QFD approach: A case study in Vietnam. Dans: KSCE Journal of Civil Engineering, v. 13, n. 5 (juillet 2009).

    https://doi.org/10.1007/s12205-009-0305-3

  10. Luu, Truong-Van / Kim, Soo-Yong / Cao, Huu-Loi / Park, Young-Min (2008): Performance measurement of construction firms in developing countries. Dans: Construction Management and Economics, v. 26, n. 4 ( 2008).

    https://doi.org/10.1080/01446190801918706

  11. Rad, Kiyanoosh Golchin / Kim, Soo-Yong (2018): Factors Affecting Construction Labor Productivity: Iran Case Study. Dans: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 42, n. 2 ( 2018).

    https://doi.org/10.1007/s40996-018-0095-2

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine