Inho Kim
- Economic Value of Combined Best Practice Use. Dans: Journal of Management in Engineering (ASCE), v. 21, n. 3 (juillet 2005). (2005):
- Benchmarking Project Level Engineering Productivity/ Inžinerinės veiklos našumo lyginimas projektų lygmeniu. Dans: Journal of Civil Engineering and Management, v. 18, n. 2 (avril 2012). (2012):
- Investigation of a Bridge Pier Scour Prediction Model for Safe Design and Inspection. Dans: Journal of Bridge Engineering (ASCE), v. 20, n. 6 (juin 2015). (2015):