-
Kim, Jeehoon / Kim, Juhyeon / Koo, Nahye / Kim, Hyoungkwan (2024): Automating scaffold safety inspections using semantic analysis of 3D point clouds. Dans: Automation in Construction, v. 166 (octobre 2024).
https://doi.org/10.1016/j.autcon.2024.105603
-
Kim, Juhyeon / Kim, Jeehoon / Kim, Yohan / Kim, Hyoungkwan (2023): 3D reconstruction of large-scale scaffolds with synthetic data generation and an upsampling adversarial network. Dans: Automation in Construction, v. 156 (décembre 2023).
https://doi.org/10.1016/j.autcon.2023.105108
-
Baek, Francis / Kim, Daeho / Park, Somin / Kim, Hyoungkwan / Lee, SangHyun (2022): Conditional Generative Adversarial Networks with Adversarial Attack and Defense for Generative Data Augmentation. Dans: Journal of Computing in Civil Engineering, v. 36, n. 3 (mai 2022).
https://doi.org/10.1061/(asce)cp.1943-5487.0001015
-
Kim, Juhyeon / Chung, Duho / Kim, Yohan / Kim, Hyoungkwan (2022): Deep learning-based 3D reconstruction of scaffolds using a robot dog. Dans: Automation in Construction, v. 134 (février 2022).
https://doi.org/10.1016/j.autcon.2021.104092
-
Park, Somin / Baek, Francis / Sohn, Jiu / Kim, Hyoungkwan (2021): Computer Vision–Based Estimation of Flood Depth in Flooded-Vehicle Images. Dans: Journal of Computing in Civil Engineering, v. 35, n. 2 (mars 2021).
https://doi.org/10.1061/(asce)cp.1943-5487.0000956
-
Bang, Seongdeok / Park, Somin / Kim, Hongjo / Kim, Hyoungkwan (2019): Encoder–decoder network for pixel‐level road crack detection in black‐box images. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 34, n. 8 (mars 2019).
https://doi.org/10.1111/mice.12440
-
Bang, Seongdeok / Kim, Hyoungkwan (2020): Context-based information generation for managing UAV-acquired data using image captioning. Dans: Automation in Construction, v. 112 (avril 2020).
https://doi.org/10.1016/j.autcon.2020.103116
-
Han, Seung H. / Park, Sang H. / Jin, Eui J. / Kim, Hyoungkwan / Seong, Yeon K. (2008): Critical Issues and Possible Solutions for Motivating Foreign Construction Workers. Dans: Journal of Management in Engineering (ASCE), v. 24, n. 4 (octobre 2008).
https://doi.org/10.1061/(asce)0742-597x(2008)24:4(217)
-
Kim, Hongjo / Kim, Hyoungkwan / Hong, Yong Won / Byun, Hyeran (2018): Detecting Construction Equipment Using a Region-Based Fully Convolutional Network and Transfer Learning. Dans: Journal of Computing in Civil Engineering, v. 32, n. 2 (mars 2018).
https://doi.org/10.1061/(asce)cp.1943-5487.0000731
-
Kim, Hyoungkwan / Rauch, Alan F. / Haas, Carl T. (2004): Automated Quality Assessment of Stone Aggregates Based on Laser Imaging and a Neural Network. Dans: Journal of Computing in Civil Engineering, v. 18, n. 1 (janvier 2004).
https://doi.org/10.1061/(asce)0887-3801(2004)18:1(58)
-
Kim, Hyoungkwan / Han, Seung H. / Kim, Moon K. (2008): Computing as Reflected in the Technology Roadmap for Center for Technology Fusion. Dans: Journal of Computing in Civil Engineering, v. 22, n. 2 (mars 2008).
https://doi.org/10.1061/(asce)0887-3801(2008)22:2(69)
-
Kim, Hyoungkwan / Haas, Carl T. / Rauch, Alan F. / Browne, Craig (2002): Dimensional Ratios for Stone Aggregates from Three-Dimensional Laser Scans. Dans: Journal of Computing in Civil Engineering, v. 16, n. 3 (juillet 2002).
https://doi.org/10.1061/(asce)0887-3801(2002)16:3(175)
-
Fan, Hongqin / AbouRizk, Simaan / Kim, Hyoungkwan / Zaïane, Osmar (2008): Assessing Residual Value of Heavy Construction Equipment Using Predictive Data Mining Model. Dans: Journal of Computing in Civil Engineering, v. 22, n. 3 (mai 2008).
https://doi.org/10.1061/(asce)0887-3801(2008)22:3(181)
-
Kim, Changyoon / Kim, Hyoungkwan / Park, Taekwun / Kim, Moon Kyum (2011): Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project. Dans: Journal of Computing in Civil Engineering, v. 25, n. 1 (janvier 2011).
https://doi.org/10.1061/(asce)cp.1943-5487.0000074
-
Park, Jungjun / Kim, Byungil / Kim, Changyoon / Kim, Hyoungkwan (2011): 3D/4D CAD Applicability for Life-Cycle Facility Management. Dans: Journal of Computing in Civil Engineering, v. 25, n. 2 (mars 2011).
https://doi.org/10.1061/(asce)cp.1943-5487.0000067
-
Wu, Yuhong / Kim, Changyoon / Kim, Hyoungkwan (2013): Error-Correction Methods for Construction Site Image Processing under Changing Illumination Conditions. Dans: Journal of Computing in Civil Engineering, v. 27, n. 1 (janvier 2013).
https://doi.org/10.1061/(asce)cp.1943-5487.0000183
-
Baek, Francis / Ha, Inhae / Kim, Hyoungkwan (2019): Augmented reality system for facility management using image-based indoor localization. Dans: Automation in Construction, v. 99 (mars 2019).
https://doi.org/10.1016/j.autcon.2018.11.034
-
Kim, Byungil / Lim, Hyunsu / Kim, Hyoungkwan / Hong, Taehoon (2012): Determining the Value of Governmental Subsidies for the Installation of Clean Energy Systems Using Real Options. Dans: Journal of Construction Engineering and Management, v. 138, n. 3 (mars 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000443
-
Kim, Hyoungkwan / Haas, Carl T. / Rauch, Alan F. / Browne, Craig (2003): 3D Image Segmentation of Aggregates from Laser Profiling. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 18, n. 4 (juillet 2003).
https://doi.org/10.1111/1467-8667.00315
-
Park, Taeil / Kim, Hyoungkwan (2013): A data warehouse-based decision support system for sewer infrastructure management. Dans: Automation in Construction, v. 30 (mars 2013).
https://doi.org/10.1016/j.autcon.2012.11.017
-
Kim, Changyoon / Kim, Hyoungkwan / Han, Seung H. / Kim, Changwan / Kim, Moon Kyum / Park, Sang H. (2009): Developing a technology roadmap for construction R&D through interdisciplinary research efforts. Dans: Automation in Construction, v. 18, n. 3 (mai 2009).
https://doi.org/10.1016/j.autcon.2008.09.008
-
Kim, Changyoon / Kim, Byoungil / Kim, Hyoungkwan (2013): 4D CAD model updating using image processing-based construction progress monitoring. Dans: Automation in Construction, v. 35 (novembre 2013).
https://doi.org/10.1016/j.autcon.2013.03.005
-
Kim, Hongjo / Kim, Kinam / Kim, Hyoungkwan (2016): Data-driven scene parsing method for recognizing construction site objects in the whole image. Dans: Automation in Construction, v. 71 (novembre 2016).
https://doi.org/10.1016/j.autcon.2016.08.018
-
Kim, Du Y. / Han, Seung H. / Kim, Hyoungkwan (2008): Discriminant Analysis for Predicting Ranges of Cost Variance in International Construction Projects. Dans: Journal of Construction Engineering and Management, v. 134, n. 6 (juin 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:6(398)
-
Yun, Sungmin / Han, Seung Heon / Kim, Hyoungkwan / Ock, Jong Ho (2009): Capital structure optimization for build–operate–transfer (BOT) projects using a stochastic and multi-objective approach. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 5 (mai 2009).
https://doi.org/10.1139/l08-134
-
Fan, Hongqin / Kim, Hyoungkwan / Zaïane, Osmar R. (2006): Data warehousing for construction equipment management. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 12 (décembre 2006).
https://doi.org/10.1139/l06-108
-
Kim, Changwan / Son, Hyojoo / Kim, Hyoungkwan / Han, Seung Heon (2008): Applicability of flash laser distance and ranging to three-dimensional spatial information acquisition and modeling on a construction site. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 11 (novembre 2008).
https://doi.org/10.1139/l08-082
-
Han, Seung H. / Park, Sang H. / Kim, Du Y. / Kim, Hyoungkwan / Kang, Yun W. (2007): Causes of Bad Profit in Overseas Construction Projects. Dans: Journal of Construction Engineering and Management, v. 133, n. 12 (décembre 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:12(932)
-
Kim, Hongjo / Kim, Hyoungkwan (2018): 3D reconstruction of a concrete mixer truck for training object detectors. Dans: Automation in Construction, v. 88 (avril 2018).
https://doi.org/10.1016/j.autcon.2017.12.034
-
Kim, Hongjo / Bang, Seongdeok / Jeong, Hoyoung / Ham, Youngjib / Kim, Hyoungkwan (2018): Analyzing context and productivity of tunnel earthmoving processes using imaging and simulation. Dans: Automation in Construction, v. 92 (août 2018).
https://doi.org/10.1016/j.autcon.2018.04.002