HyeonSeung Kim
- BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps. Dans: Journal of Computing in Civil Engineering, v. 29, n. 3 (mai 2015). (2015):
- Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces. Dans: Automation in Construction, v. 39 (avril 2014). (2014):