0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Kim, Dohyun (2021): Large deformation finite element analyses in TBM tunnel excavation: CEL and auto-remeshing approach. Dans: Tunnelling and Underground Space Technology, v. 116 (octobre 2021).

    https://doi.org/10.1016/j.tust.2021.104081

  2. Jeong, Sangseom / Kim, Dohyun / Park, Jongjeon (2021): Empirical Bearing Capacity Formula for Steel Pipe Prebored and Precast Piles Based on Field Tests. Dans: International Journal of Geomechanics, v. 21, n. 9 (septembre 2021).

    https://doi.org/10.1061/(asce)gm.1943-5622.0002112

  3. Kim, Dohyun / Kim, Jaehong / Jeong, Sangseom (2019): Estimation of axial stiffness on existing and reinforcing piles in vertical extension remodeled buildings. Dans: Engineering Structures, v. 199 (novembre 2019).

    https://doi.org/10.1016/j.engstruct.2019.109466

  4. Kim, Dohyun / Jeong, Sangseom / Park, Jongjeon (2020): Analysis on shaft resistance of the steel pipe prebored and precast piles based on field load-transfer curves and finite element method. Dans: Soils and Foundations, v. 60, n. 2 (avril 2020).

    https://doi.org/10.1016/j.sandf.2020.03.011

  5. Jeong, Sangseom / Kim, Dohyun (2020): Estimation of design axial stiffness of reinforcing piles in vertical extension remodelling process using numerical computation. Dans: Engineering Structures, v. 214 (juillet 2020).

    https://doi.org/10.1016/j.engstruct.2020.110623

  6. Kim, Dohyun / Jeong, Sangseom (2019): Comparative study of load distribution ratio of various piled raft foundations based on coupled stiffness matrix. Dans: The Structural Design of Tall and Special Buildings, v. 28, n. 16 (novembre 2019).

    https://doi.org/10.1002/tal.1669

  7. Kim, Dohyun / Jeong, Sangseom / Jung, Gyungja / Park, Jongjeon (2018): The Load-sharing ratio of prebored and precast pile in top-down method construction process. Dans: The Structural Design of Tall and Special Buildings, v. 27, n. 10 (juillet 2018).

    https://doi.org/10.1002/tal.1472

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine