- Influential factors for risk assessment and allocation on complex design-build infrastructure projects; the Texas experience. Dans: Frontiers in Built Environment, v. 10 (février 2024). (2024):
- Exploring a Quantitative and Qualitative Mixed Approach for Estimating Preliminary Engineering Efforts of Bridge Replacement Projects. Dans: Transportation Research Record: Journal of the Transportation Research Board, v. 2674, n. 6 (18 mai 2020). (2020):
- Developing a Preliminary Engineering Cost Estimation Method for a Portfolio of Bridge Construction Projects in Project Planning Phase. Dans: Transportation Research Record: Journal of the Transportation Research Board, v. 2676, n. 8 (18 mai 2022). (2022):
- Quantitative Approach to Assess Social Equity in Road Networks. Dans: Journal of Infrastructure Systems, v. 29, n. 4 (décembre 2023). (2023):
- A critical review and analysis of decision-support processes and tools for project delivery method selection. Dans: Engineering, Construction and Architectural Management, v. 31, n. 1 (septembre 2022). (2022):
- Lessons Learned from Selection of Project Delivery Methods in Highway Projects: The Texas Experience. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 1 (février 2020). (2020):
- Impact of Multiple Highway Funding Categories and Project Eligibility Restrictions on Pavement Performance. Dans: Journal of Infrastructure Systems, v. 25, n. 1 (mars 2019). (2019):
- (2019): Framework for Spatial-Temporal Cross-Functional Planning of Projects by Highway Agencies. Dans: Frontiers in Built Environment, v. 5 (novembre 2019).
- Innovations in Project Delivery Method Selection Approach in the Texas Department of Transportation. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 6 (novembre 2018). (2018):
- Planning-Phase Estimation of Construction Time for a Large Portfolio of Highway Projects. Dans: Journal of Construction Engineering and Management, v. 145, n. 4 (avril 2019). (2019):
- Development and Application of a Production-Rate Resource for Contract Time Determination. Dans: Journal of Construction Engineering and Management, v. 144, n. 12 (décembre 2018). (2018):