Moustafa Kassab
- Overall multiobjective optimization of construction projects scheduling using particle swarm. Dans: Engineering, Construction and Architectural Management, v. 23, n. 3 (mai 2016). (2016):
- Computerized DSS for Construction Conflict Resolution under Uncertainty. Dans: Journal of Construction Engineering and Management, v. 136, n. 12 (décembre 2010). (2010):
- Conflict Resolution in Construction Disputes Using the Graph Model. Dans: Journal of Construction Engineering and Management, v. 132, n. 10 (octobre 2006). (2006):
- Incorporating rework into construction schedule analysis. Dans: Automation in Construction, v. 20, n. 8 (décembre 2011). (2011):
- Resource Optimization Using Combined Simulation and Genetic Algorithms. Dans: Journal of Construction Engineering and Management, v. 129, n. 6 (décembre 2003). (2003):
- Multi-criteria decision analysis for infrastructure privatisation using conflict resolution. Dans: Structure and Infrastructure Engineering, v. 7, n. 9 (septembre 2011). (2011):