Makoto Kanai
- Effects Of Clearance Of Tail-void On The Load Of Segments In Shield Tunnel. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1991, n. 439 (décembre 1991). (1991):
- A Study On Lining Design Of Earth Tunnels With Large Diameter Under High Water Pressure. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1996, n. 540 (juin 1996). (1996):
- Rapid Shield Tunneling In Metropolitan Outer-discharge Project, Tunnel Contract No. 1. 外郭放水路第1工区トンネル新設工事. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 2002, n. 714 (septembre 2002). (2002):
- A computer-aided tunneling system (CATS) aids in planning and building an urban underground reservoir project. Dans: Tunnelling and Underground Space Technology, v. 3, n. 3 ( 1988). (1988):
- Design of the shield tunnel for the trans-Tokyo bay highway. Dans: Tunnelling and Underground Space Technology, v. 7, n. 3 (juillet 1992). (1992):
- Acoustic emission monitoring of a reinforced concrete structure by applying new fiber-optic sensors. Dans: Smart Materials and Structures, v. 14, n. 3 (juin 2005). (2005):
- Dynamic strain distribution measurement and crack detection of an adhesive-bonded single-lap joint under cyclic loading using embedded FBG. Dans: Smart Materials and Structures, v. 23, n. 10 (octobre 2014). (2014):
- Design and construction of the underground river by the shield method. Présenté pendant: AFTES – Paris 25-28 octobre 1999. (1999):