Alexandros Kallantzis
- Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. Dans: Engineering, Construction and Architectural Management, v. 11, n. 3 (juin 2004). (2004):
- Linear versus Network Scheduling: A Critical Path Comparison. Dans: Journal of Construction Engineering and Management, v. 133, n. 7 (juillet 2007). (2007):