A. P. Kaka
- Analysis of the accuracy of standard/average value curves using food retail building projects as case studies. Dans: Engineering, Construction and Architectural Management, v. 5, n. 1 (janvier 1998). (1998):
- The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Dans: Engineering, Construction and Architectural Management, v. 6, n. 3 (mars 1999). (1999):
- The effects of the variability of project planning on cost commitment curves: a case study. Dans: Engineering, Construction and Architectural Management, v. 10, n. 1 (février 2003). (2003):
- Estimation of project total cost and duration for housing projects in the U.K.. Dans: Building and Environment, v. 31, n. 4 (juillet 1996). (1996):
- A Decision Support Model for Construction Cash Flow Management. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 22, n. 7 (octobre 2007). (2007):
- Modelling standard cost commitment curves for contractors' cash flow forecasting. Dans: Construction Management and Economics, v. 11, n. 4 (juillet 1993). (1993):
- A neural networks approach for cost flow forecasting. Dans: Construction Management and Economics, v. 16, n. 4 (juillet 1998). (1998):