Ilan Juran
- Risk Assessment Method for Forecasting Time-Dependent Aging Effects on Corrosion Rate: Preemptive Bridge Assets Management. Dans: Journal of Infrastructure Systems, v. 30, n. 3 (septembre 2024). (2024):
- Statistical Data Analysis for Trackway Asset Management Using Low-Level Nonconformance Rates. Dans: Journal of Infrastructure Systems, v. 29, n. 1 (mars 2023). (2023):
- Statistical Data Analysis of the Aging Effect on Time-Dependent Corrosion Rate for Steel Girder Bridges with Concrete Decks. Dans: Journal of Infrastructure Systems, v. 28, n. 2 (juin 2022). (2022):
- Machine-Learning–Based Risk Assessment Method for Leak Detection and Geolocation in a Water Distribution System. Dans: Journal of Infrastructure Systems, v. 26, n. 1 (mars 2020). (2020):