0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Jeong, Gilsu / Jung, Minhyuk / Park, Seongeun / Park, Moonseo / Ahn, Changbum Ryan (2024): Contextual multimodal approach for recognizing concurrent activities of equipment in tunnel construction projects. Dans: Automation in Construction, v. 158 (février 2024).

    https://doi.org/10.1016/j.autcon.2023.105195

  2. Dharmapalan, Vineeth / O'Brien, William J. / Morrice, Douglas / Jung, Minhyuk (2021): Assessment of visibility in industrial construction projects: a viewpoint from supply chain stakeholders. Dans: Construction Innovation, v. 21, n. 4 (août 2021).

    https://doi.org/10.1108/ci-07-2020-0114

  3. Kim, Jinwoo / Min, Kyungjun / Jung, Minhyuk / Chi, Seokho (2020): Occupant behavior monitoring and emergency event detection in single-person households using deep learning-based sound recognition. Dans: Building and Environment, v. 181 (août 2020).

    https://doi.org/10.1016/j.buildenv.2020.107092

  4. Hyun, Hosang / Jung, Minhyuk / Yoon, Inseok / Lee, Hyun-Soo / Lee, Jeonghoon (2020): Multiple work zone strategy for repetitive on-site work of modular construction using parallel station method. Dans: Journal of Asian Architecture and Building Engineering, v. 20, n. 3 (octobre 2020).

    https://doi.org/10.1080/13467581.2020.1782917

  5. Jung, Minhyuk / Chi, Seokho (2020): Human activity classification based on sound recognition and residual convolutional neural network. Dans: Automation in Construction, v. 114 (juin 2020).

    https://doi.org/10.1016/j.autcon.2020.103177

  6. Lee, Kwang-Pyo / Lee, Hyun-Soo / Park, Moonseo / Kim, Du Yon / Jung, Minhyuk (2017): Management-Reserve Estimation for International Construction Projects Based on Risk-Informed k-NN. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 4 (juillet 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000510

  7. Jung, Minhyuk / Park, Moonseo / Lee, Hyun-Soo / Chi, Seokho (2018): Multimethod Supply Chain Simulation Model for High-Rise Building Construction Projects. Dans: Journal of Computing in Civil Engineering, v. 32, n. 3 (mai 2018).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000751

  8. Jung, Minhyuk / Park, Moonseo / Lee, Hyun-Soo / Chi, Seokho (2017): Agent-Based Lift System Simulation Model for High-Rise Building Construction Projects. Dans: Journal of Computing in Civil Engineering, v. 31, n. 6 (novembre 2017).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000707

  9. Jung, Minhyuk / Ko, Sungjin / Chi, Seokho (2017): A Progress Measurement Framework for Large-Scale Urban Construction Projects. Dans: KSCE Journal of Civil Engineering, v. 22, n. 7 (août 2017).

    https://doi.org/10.1007/s12205-017-0245-2

  10. Jung, Minhyuk / Park, Moonseo / Lee, Hyun-Soo / Kim, Hyunsoo (2016): Weather-Delay Simulation Model Based on Vertical Weather Profile for High-Rise Building Construction. Dans: Journal of Construction Engineering and Management, v. 142, n. 6 (juin 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001109

  11. Jung, Minhyuk / Moon, Jooyong / Park, Moonseo / Lee, Hyun-Soo / Joo, Seon U. / Lee, Kwang-Pyo (2017): Construction worker hoisting simulation for sky-lobby lifting system. Dans: Automation in Construction, v. 73 (janvier 2017).

    https://doi.org/10.1016/j.autcon.2016.10.002

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine