Jaeho Jung
- (2012): Yi Sun-sin Bridge: A Challenging Method for Catwalk Erection. Présenté pendant: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- A Study on Slip Form System for High-rise Pylon using GPS. Présenté pendant: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- (2010): Practical Design of Continuous Two Main-span Suspension Bridge in Korea. Présenté pendant: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010.