Dho Heon Jun
- Optimizing the Utilization of Shareable Equipment in Multiple Shifts for Construction Projects. Dans: Journal of Asian Architecture and Building Engineering, v. 15, n. 3 (septembre 2016). (2016):
- Fast and Accurate Risk Evaluation for Scheduling Large-Scale Construction Projects. Dans: Journal of Computing in Civil Engineering, v. 25, n. 5 (septembre 2011). (2011):
- Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling. Dans: Journal of Construction Engineering and Management, v. 137, n. 12 (décembre 2011). (2011):
- Optimizing Resource Leveling in Construction Projects. Dans: Journal of Construction Engineering and Management, v. 135, n. 11 (novembre 2009). (2009):
- Optimizing the utilization of multiple labor shifts in construction projects. Dans: Automation in Construction, v. 19, n. 2 (mars 2010). (2010):