Helena Johnsson
- Production strategies for pre-engineering in house-building: exploring product development platforms. Dans: Construction Management and Economics, v. 31, n. 9 (septembre 2013). (2013):
- Platform use in systems building. Dans: Construction Management and Economics, v. 32, n. 1-2 (juillet 2013). (2013):
- A study of a plan-do-check-act method used in less industrialized activities: two cases from industrialized housebuilding. Dans: Construction Management and Economics, v. 32, n. 1-2 (juillet 2013). (2013):
- Construction Purchasing and Supply Chain Management. Dans: Construction Management and Economics. :
- Managing for continuous improvement in off‐site construction. Evaluation of lean management principles. Dans: Engineering, Construction and Architectural Management, v. 19, n. 2 (février 2012). (2012):
- 3D Computer Visualization in Timber Construction—Some Important Parameters. Dans: Architectural Engineering and Design Management, v. 2, n. 3 (janvier 2006). (2006):
- Flax Fiber-Reinforced Glued-Laminated Timber in Tension Perpendicular to the Grain: Experimental Study and Probabilistic Analysis. Dans: Journal of Materials in Civil Engineering (ASCE), v. 22, n. 9 (septembre 2010). (2010):
- Prediction model for the load-carrying capacity of nailed timber joints subjected to plug shear. Dans: Materials and Structures, v. 46, n. 12 (décembre 2013). (2013):
- Configuration through the parameterization of building components. Dans: Automation in Construction, v. 23 (mai 2012). (2012):
- Defects in offsite construction: timber module prefabrication. Dans: Construction Management and Economics, v. 27, n. 7 ( 2009). (2009):
- Provisions for Ductile Behavior of Timber-to-Steel Connections with Multiple Glued-In Rods. Dans: Journal of Structural Engineering (ASCE), v. 139, n. 9 (septembre 2013). (2013):