Kurt Joham
- From conventional to mechanised tunnelling - A technical and operational challenge. Vom konventionellen zum maschinellen Vortrieb - Eine technische und baubetriebliche Herausforderung. Dans: Geomechanics and Tunnelling, v. 11, n. 6 (décembre 2018). (2018):
- DB major project Stuttgart-Ulm, Albaufstieg-Steinbühl Tunnel - Tunnel excavation and lining in karst. Dans: Geomechanics and Tunnelling, v. 10, n. 5 (octobre 2017). (2017):
- Optimisation of the TBM drive at the Boßler Tunnel using the observation method and an incremental design and contract development process. Dans: Geomechanics and Tunnelling, v. 10, n. 2 (avril 2017). (2017):