- Stochastic modelling of flexible load characteristics of split-type air conditioners using grey-box modelling and random forest method. Dans: Energy and Buildings, v. 273 (octobre 2022). (2022):
- Comparative Study on Perception of Causes for Construction Task Delay in China and the United States. Dans: Journal of Construction Engineering and Management, v. 147, n. 3 (mars 2021). (2021):
- Experimental study on the tower loading characteristics of a floating wind turbine based on wave basin model tests. Dans: Journal of Wind Engineering and Industrial Aerodynamics, v. 207 (décembre 2020). (2020):
- How Does Experience with Delay Shape Managers’ Making-Do Decision: Random Forest Approach. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 4 (juillet 2020). (2020):
- Monitoring blade loads for a floating wind turbine in wave basin model tests using Fiber Bragg Grating sensors: A feasibility study. Dans: Marine Structures, v. 71 (mai 2020). (2020):