Shanshan Jiang
- Precast components on-site construction planning and scheduling method based on a novel deep learning integrated multi-agent system. Dans: Journal of Building Engineering, v. 102 (mai 2025). (2025):
- ZIF-8-decorated wood sponge derived from biomimetic mineralization of polydopamine. Dans: Green Materials, v. 12, n. 4 (1 décembre 2024). (2024):
- (2022): Non-Intrusive Load Disaggregation Based on a Feature Reused Long Short-Term Memory Multiple Output Network. Dans: Buildings, v. 12, n. 7 (5 juillet 2022).
- Spatio-temporal deduction of floor construction based on the agent modeling of construction actors. Dans: Automation in Construction, v. 142 (octobre 2022). (2022):