Fuliang Jiang
- Cause Analysis of Bridge Erecting Machine Tipping Accident based on Fault Tree and the Corresponding Countermeasures. Dans: Procedia Engineering, v. 45 ( 2012). (2012):
- A Nonlinear Approach for Time-Dependent Settlement Analysis of a Single Pile and Pile Groups. Dans: Soil Mechanics and Foundation Engineering, v. 54, n. 1 (mars 2017). (2017):