0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Cho, Kyuman / Yang, Junho / Kim, Taehoon / Jang, Woosik (2021): Influence of building characteristics and renovation techniques on the energy-saving performances of EU smart city projects. Dans: Energy and Buildings, v. 252 (décembre 2021).

    https://doi.org/10.1016/j.enbuild.2021.111477

  2. Min, Jang Hee / Jang, Woosik / Han, Seung Heon / Kim, Doyun / Kwak, Young Hoon (2018): How Conflict Occurs and What Causes Conflict: Conflict Analysis Framework for Public Infrastructure Projects. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 4 (juillet 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000625

  3. Jang, Woosik / Lee, Sang Ku / Han, Seung Heon (2018): Sustainable Performance Index for Assessing the Green Technologies in Urban Infrastructure Projects. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 2 (mars 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000582

  4. Jang, Woosik / Hong, Hwa-Uk / Han, Seung H. / Baek, Seung Won (2017): Optimal Supply Vendor Selection Model for LNG Plant Projects Using Fuzzy-TOPSIS Theory. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 2 (mars 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000474

  5. Jung, Wooyong / Han, Seung H. / Koo, Bonsang / Jang, Woosik (2012): Which Strategies Are More Effective for International Contractors during Boom and Recession Periods?. Dans: Journal of Management in Engineering (ASCE), v. 28, n. 3 (juillet 2012).

    https://doi.org/10.1061/(asce)me.1943-5479.0000087

  6. Lee, Jung Ki / Han, Seung H. / Jang, Woosik / Jung, Wooyong (2017): "Win-win strategy" for sustainable relationship between general contractors and subcontractors in international construction projects. Dans: KSCE Journal of Civil Engineering, v. 22, n. 2 (juin 2017).

    https://doi.org/10.1007/s12205-017-1613-7

  7. Jang, Woosik / Yu, Giwon / Jung, Wooyong / Kim, Doyun / Han, Seung Heon (2018): Financial Conflict Resolution for Public-Private Partnership Projects Using a Three-Phase Game Framework. Dans: Journal of Construction Engineering and Management, v. 144, n. 3 (mars 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001442

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine