C. James
- Castle Bridge, Weston-Super-Mare, UK. Dans: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 156, n. 1 (mars 2003). (2003):
- Method of Removing Rock under Water, as Adopted in the Enlargement and Deepening of the Harbour and Entrance Channel to the Welland Canal at Port Colborne. Dans: Minutes of the Proceedings of the Institution of Civil Engineers, v. 80, n. 1885-2 ( 1885). (1885):
- Castle Bridge, Weston-Super-Mare, UK. Dans: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 156, n. 1 (mars 2003). (2003):