A. Jaafari
- Twinning Time and Cost in Incentive-Based Contracts. Dans: Journal of Management in Engineering (ASCE), v. 12, n. 4 (juillet 1996). (1996):
- New Vistas in Strategic Assessment of Projects. Dans: Journal of Management in Engineering (ASCE), v. 4, n. 2 (avril 1988). (1988):
- Genesis of Management Confidence Technique. Dans: Journal of Management in Engineering (ASCE), v. 3, n. 1 (avril 1987). (1987):
- Surviving Failures: Lessons from Field Study. Dans: Journal of Construction Engineering and Management, v. 116, n. 1 (mars 1990). (1990):
- Realistic Model for Equipment Replacement. Dans: Journal of Construction Engineering and Management, v. 116, n. 3 (septembre 1990). (1990):
- Concurrent Construction and Life Cycle Project Management. Dans: Journal of Construction Engineering and Management, v. 123, n. 4 (décembre 1997). (1997):
- Cost and Performance Analysis of Tall Structures. Dans: Journal of Structural Engineering (ASCE), v. 114, n. 11 (novembre 1988). (1988):