  1. Doloi, Hemanta / Sawhney, Anil / Iyer, K. C. (2012): Structural equation model for investigating factors affecting delay in Indian construction projects. Dans: Construction Management and Economics, v. 30, n. 10 (octobre 2012).

    https://doi.org/10.1080/01446193.2012.717705

  2. Iyer, K. C. / Manan Bindal, Yogita (2019): Case Study on Home Office Overhead Claims. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 11, n. 3 (août 2019).

    https://doi.org/10.1061/(asce)la.1943-4170.0000288

  3. Patil, Smita K. / Iyer, K. C. / Chaphalkar, N. B. (2019): Influence of Extrinsic Factors on Construction Arbitrators’ Decision Making. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 11, n. 4 (novembre 2019).

    https://doi.org/10.1061/(asce)la.1943-4170.0000318

  4. Bhattacharya, Sanjay / Momaya, Kirankumar S. / Iyer, K. C. (2021): Bridging the gaps for business growth among Indian construction companies. Dans: Built Environment Project and Asset Management, v. 11, n. 2 (avril 2021).

    https://doi.org/10.1108/bepam-08-2020-0135

  5. Iyer, K. C. / Sagheer, Mohammed (2012): Optimization of Bid-Winning Potential and Capital Structure for Build-Operate-Transfer Road Projects in India. Dans: Journal of Management in Engineering (ASCE), v. 28, n. 2 (avril 2012).

    https://doi.org/10.1061/(asce)me.1943-5479.0000071

  6. Chaphalkar, Nitin Balkrishna / Iyer, K. C. (2014): Factors influencing decisions on delay claims in construction contracts for Indian scenario. Dans: Australasian Journal of Construction Economics and Building, v. 14, n. 1 (mars 2014).

    https://doi.org/10.5130/ajceb.v14i1.3766

  7. Iyer, K. C. / Chaphalkar, N. B. / Patil, Smita K. (2018): Intrinsic Factors Influencing Decision making of Arbitrators in Dispute Resolution of variation Claims. Dans: Journal of The Institution of Engineers (India): Series A, v. 99, n. 2 (avril 2018).

    https://doi.org/10.1007/s40030-018-0265-z

  8. Iyer, K. C. / Sagheer, Mohammed (2010): Hierarchical Structuring of PPP Risks Using Interpretative Structural Modeling. Dans: Journal of Construction Engineering and Management, v. 136, n. 2 (février 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000127

  9. Iyer, K. C. / Jha, K. N. (2006): Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects. Dans: Journal of Construction Engineering and Management, v. 132, n. 8 (août 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:8(871)

  10. Iyer, K. C. / Sagheer, Mohammed (2011): A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Dans: Construction Management and Economics, v. 29, n. 8 (août 2011).

    https://doi.org/10.1080/01446193.2011.597412

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine