I. Iwasaki
- Development of precast slab using ultra high strength fiber reinforced concrete for replacement on highway bridge. Présenté pendant: Ninth International Conference on Bridge Maintenance, Safety and Management, IABMAS 2018, 9-13 July 2018, Melbourne, Australia. (2018):
- デザインビルド方式で発注された新東名高速道路青木川橋(仮称)の設計および施工 (Design and Construction of the New TOMEI Expressway Aokigawa Bridge (a tentative name) Ordered with the Design-Build Bidding System). Dans: Concrete Journal (JCI), v. 51, n. 11 ( 2013). (2013):