Syuhaida Ismail
- Towards the adoption of most suitable green walls within sustainable buildings using interval type-2 fuzzy best-worst method and TOPSIS technique. Dans: Engineering, Construction and Architectural Management, v. 31, n. 3 (décembre 2022). (2022):
- (2022): Improving Project Communications Management Practices in the Construction Sector during the COVID-19 Pandemic: A Malaysian Scenario. Dans: Buildings, v. 12, n. 9 (16 septembre 2022).
- Implementation Strategies of Building Information Modelling towards Sustainable Residential Construction Project in Malaysia. Dans: Civil Engineering and Architecture, v. 10, n. 4 (juillet 2022). (2022):
- (2022): Status of Value Management Implementation in Small and Medium Construction Projects in Malaysia. Dans: Buildings, v. 12, n. 5 (24 avril 2022).
- Barriers to the implementation of value management in small construction projects. Dans: Journal of Building Engineering, v. 54 (août 2022). (2022):
- Towards the Development of a Comprehensive Lifecycle Risk Assessment Model for Green Roof Implementation. Dans: Sustainable Cities and Society, v. 76 (janvier 2022). (2022):
- Deterrents to the adoption of green walls: a hybrid fuzzy-based approach. Dans: Engineering, Construction and Architectural Management, v. 29, n. 9 (août 2022). (2022):
- Towards the success of Building Information Modelling implementation: A fuzzy-based MCDM risk assessment tool. Dans: Journal of Building Engineering, v. 43 (novembre 2021). (2021):
- Barriers to the use of integrated project delivery (IPD): a quantified model for Malaysia. Dans: Engineering, Construction and Architectural Management, v. 27, n. 1 ( 2020). (2020):
- A prototype decision support system for green roof type selection: A cybernetic fuzzy ANP method. Dans: Sustainable Cities and Society, v. 48 (juillet 2019). (2019):
- The importance of contractors’ performance appraisal system for biophilic city development in Malaysia. Dans: IOP Conference Series: Materials Science and Engineering, v. 849 (mai 2020). (2020):
- Assessing Construction Labours’ Safety Level: A Fuzzy MCDM Approach. Dans: Journal of Civil Engineering and Management, v. 26, n. 2 (février 2020). (2020):
- On-site construction productivity in Malaysian infrastructure projects. Dans: Structural Survey, v. 34, n. 1 (août 2016). (2016):
- Local Contractors' Awareness on Competitiveness towards Liberalisation and Globalisation in the Malaysian Construction Industry. Dans: Journal of Construction in Developing Countries, v. 23, n. 1 ( 2018). (2018):
- Key Factors Affecting Construction Safety Performance in Developing Countries: Evidence from Cambodia. Dans: Construction Economics and Building, v. 17, n. 4 (décembre 2017). (2017):
- Structural Equation Model of the Factors Affecting Construction Labor Productivity. Dans: Journal of Construction Engineering and Management, v. 144, n. 4 (avril 2018). (2018):