- Cost Overrun Risk Assessment for Healthcare Projects: A Modified Fuzzy Group Decision-Making Approach. Dans: Journal of Construction Engineering and Management, v. 150, n. 12 (décembre 2024). (2024):
- A Framework for Assessing the Impacts of COVID-19 on the Construction Industries in Developing Countries. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 38, n. 5 (octobre 2024). (2024):
- Fuzzy Approach for Evaluating Critical Factors in the Design and Construction of Conventional Wastewater Treatment Plants. Dans: Journal of Infrastructure Systems, v. 30, n. 1 (mars 2024). (2024):
- Structuring risks for a comprehensive understanding of cost overruns in power plant projects. Dans: Construction Innovation. :
- Budget And Cost Contingency Cart Models For Power Plant Projects. Dans: Journal of Civil Engineering and Management, v. 28, n. 8 (26 octobre 2022). (2022):
- Nonconformity Assessment in Building Construction Projects: A Fuzzy Group Decision-Making Approach. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 37, n. 1 (février 2023). (2023):
- A Coupled Genetic Programming Monte Carlo Simulation–Based Model for Cost Overrun Prediction of Thermal Power Plant Projects. Dans: Journal of Construction Engineering and Management, v. 148, n. 8 (août 2022). (2022):
- Risk induced contingency cost modeling for power plant projects. Dans: Automation in Construction, v. 123 (mars 2021). (2021):
- Grasping the Nonconformities in Building Construction Supply Chains. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 35, n. 1 (février 2021). (2021):
- Construction delays in privately funded large building projects in Bangladesh. Dans: Asian Journal of Civil Engineering, v. 19, n. 4 (mars 2018). (2018):
- Modified Fuzzy Group Decision-Making Approach to Cost Overrun Risk Assessment of Power Plant Projects. Dans: Journal of Construction Engineering and Management, v. 145, n. 2 (février 2019). (2019):