0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Michael W. Ibrahim ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Ibrahim, Michael W. / Labib, Youssef / Veeramani, Dharmaraj / Hanna, Awad S. / Russell, Jeffrey (2021): Comprehensive Model for Construction Readiness Assessment. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 1 (janvier 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000832

  2. Ibrahim, Michael W. / Hanna, Awad / Kievet, Dave (2020): Quantitative Comparison of Project Performance between Project Delivery Systems. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 6 (novembre 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000837

  3. Ibrahim, Michael W. / Hanna, Awad S. / Russell, Jeffrey S. / Abotaleb, Ibrahim S. / El-adaway, Islam H. (2020): Quantitative Analysis of the Impacts of Out-of-Sequence Work on Project Performance. Dans: Journal of Construction Engineering and Management, v. 146, n. 8 (août 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001876

  4. Ibrahim, Michael W. / Hanna, Awad S. / Russell, Jeffrey S. / Abotaleb, Ibrahim S. / El-adaway, Islam H. (2020): Comprehensive Analysis of Factors Associated with Out-of-Sequence Construction. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 4 (juillet 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000777

  5. Abotaleb, Ibrahim S. / El-adaway, Islam H. / Ibrahim, Michael W. / Hanna, Awad S. / Russell, Jeffrey S. (2020): Developing a Rating Score for Out-of-Sequence Construction. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 3 (mai 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000765

  6. Abotaleb, Ibrahim S. / El-adaway, Islam H. / Ibrahim, Michael W. / Hanna, Awad S. / Russell, Jeffrey S. (2019): Causes, Early Warning Signs, and Impacts of Out-of-Sequence Construction: Expert-Based Survey Analysis. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 6 (novembre 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000724

  7. Hanna, Awad S. / Ibrahim, Michael W. / Lotfallah, Wafik / Iskandar, Karim A. / Russell, Jeffrey S. (2016): Modeling Project Manager Competency: An Integrated Mathematical Approach. Dans: Journal of Construction Engineering and Management, v. 142, n. 8 (août 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001141

  8. Hanna, Awad S. / Iskandar, Karim A. / Lotfallah, Wafik / Ibrahim, Michael W. / Russell, Jeffrey S. (2018): data-driven approach for identifying project manager competency weights. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 45, n. 1 (janvier 2018).

    https://doi.org/10.1139/cjce-2017-0237

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine