Hosang Hyun
- (2021): Tower Crane Location Optimization for Heavy Unit Lifting in High-Rise Modular Construction. Dans: Buildings, v. 11, n. 3 (27 février 2021).
- (2021): Analysis of safety risk factors of modular construction to identify accident trends. Dans: Journal of Asian Architecture and Building Engineering, v. 21, n. 3 (août 2021).
- Multiobjective optimization for modular unit production lines focusing on crew allocation and production performance. Dans: Automation in Construction, v. 125 (mai 2021). (2021):
- Multiple work zone strategy for repetitive on-site work of modular construction using parallel station method. Dans: Journal of Asian Architecture and Building Engineering, v. 20, n. 3 (octobre 2020). (2020):
- Classification of Modular Building Construction Projects Based on Schedule-Driven Approach. Dans: Journal of Construction Engineering and Management, v. 145, n. 5 (mai 2019). (2019):
- Workflow dependency approach for modular building construction manufacturing process using Dependency Structure Matrix (DSM). Dans: KSCE Journal of Civil Engineering, v. 21, n. 5 (août 2016). (2016):
- Multiple Modular Building Construction Project Scheduling Using Genetic Algorithms. Dans: Journal of Construction Engineering and Management, v. 145, n. 1 (janvier 2019). (2019):