Hans Hutton
- (2012): Huey P. Long Bridge – Innovative Truss Erection Scheme. Présenté pendant: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- Making the Impossible Possible. Dans: Civil Engineering Magazine, v. 84, n. 10 (novembre 2014). (2014):
- (2008): The New Main Street Bridge, Columbus, Ohio. A Signature Single-Rib Tied Arch. Présenté pendant: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008.