Rong‐Yau Huang
- Graphically based LP modelling for linear scheduling analysis: the POLO system. Dans: Engineering, Construction and Architectural Management, v. 7, n. 1 (janvier 2000). (2000):
- A performance‐based bridge LCCA model using visual inspection inventory data. Dans: Construction Management and Economics, v. 24, n. 10 (octobre 2006). (2006):