0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Huang, C. / Eckstädt, E. (2023): Comparison of different coupling variants for building and HVAC simulation. Dans: Journal of Physics: Conference Series, v. 2600, n. 7 (1 novembre 2023).

    https://doi.org/10.1088/1742-6596/2600/7/072005

  2. Gardner, L. / Li, J. / Meng, X. / Huang, C. / Kyvelou, P. (2024): I-section steel columns strengthened by wire arc additive manufacturing - concept and experiments. Dans: Engineering Structures, v. 306 (mai 2024).

    https://doi.org/10.1016/j.engstruct.2024.117763

  3. Kyvelou, P. / Huang, C. / Li, J. / Gardner, L. (2024): Residual stresses in steel I-sections strengthened by wire arc additive manufacturing. Dans: Structures, v. 60 (février 2024).

    https://doi.org/10.1016/j.istruc.2023.105828

  4. Ganguly, C. / Huang, C. / Rabideau, A. J. / van Benschoten, J. E. (1999): Simple Metal Sorption Model for Heterogeneous Sorbents: Application to Humic Materials. Dans: Journal of Environmental Engineering (ASCE), v. 125, n. 8 (août 1999).

    https://doi.org/10.1061/(asce)0733-9372(1999)125:8(712)

  5. Weng, X. / Huang, C. / Long, T. / Li, S. M. / Liu, M. B. (2019): An integrated finite particle method with perfectly matched layer for modeling wave-structure interaction. Dans: Coastal Engineering Journal, v. 61, n. 1 (janvier 2019).

    https://doi.org/10.1080/21664250.2018.1560681

  6. Huang, C. / Wong, C. K. / Tam, C. M. (2011): Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming. Dans: Automation in Construction, v. 20, n. 5 (août 2011).

    https://doi.org/10.1016/j.autcon.2010.11.023

  7. Huang, C. / Wong, C. K. / Tam, C. M. (2010): Optimization of material hoisting operations and storage locations in multi-storey building construction by mixed-integer programming. Dans: Automation in Construction, v. 19, n. 5 (août 2010).

    https://doi.org/10.1016/j.autcon.2010.02.005

  8. Huang, C. / Wong, C. K. (2015): Optimisation of site layout planning for multiple construction stages with safety considerations and requirements. Dans: Automation in Construction, v. 53 (mai 2015).

    https://doi.org/10.1016/j.autcon.2015.03.005

  9. Huang, C. / Wong, C. K. (2017): Discretized Cell Modeling for Optimal Facility Layout Plans of Unequal and Irregular Facilities. Dans: Journal of Construction Engineering and Management, v. 143, n. 1 (janvier 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001206

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine