Tiesong Hu
- Decision support system for contractor pre‐qualification—artificial neural network model. Dans: Engineering, Construction and Architectural Management, v. 7, n. 3 (mars 2000). (2000):
- Multi‐project cash flow optimization: non‐inferior solution through neuro‐multiobjective algorithm. Dans: Engineering, Construction and Architectural Management, v. 8, n. 2 (février 2001). (2001):
- An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Dans: Construction Management and Economics, v. 19, n. 1 (janvier 2001). (2001):
- A fuzzy neural network approach for contractor prequalification. Dans: Construction Management and Economics, v. 19, n. 2 (mars 2001). (2001):