Qizhou Hu
- Braess Paradox in Optimal Multiperiod Resource-Constrained Restoration Scheduling Problem. Dans: International Journal of Civil Engineering, v. 22, n. 7 (avril 2024). (2024):
- GST-based polarization approach to picking P-and S-waves arrival time for high-speed rail early warning system. Dans: Soil Dynamics and Earthquake Engineering, v. 177 (février 2024). (2024):