- (2020): The Real-Time Automated Monitoring System for Lateral Deflection of Underground Structures. Dans: Advances in Civil Engineering, v. 2020 (janvier 2020).
- The Vertical Bearing Mechanism of Hybrid Bored Pre-stressed Concrete Cased Piles. Dans: International Journal of Civil Engineering, v. 18, n. 3 (octobre 2019). (2019):
- Hybrid Bored Prestressed Concrete Cased Piles: Equipment and Construction Procedures. Dans: Journal of Construction Engineering and Management, v. 144, n. 12 (décembre 2018). (2018):