- Assessing the Impact of Construction Risks on Cost Overruns: A Risk Path Simulation–Driven Approach. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 6 (novembre 2022). (2022):
- Fuzzy Logic Model for Selection of Vertical Formwork Systems. Dans: Journal of Construction Engineering and Management, v. 138, n. 7 (juillet 2012). (2012):
- Selection of slab formwork system using fuzzy logic. Dans: Construction Management and Economics, v. 29, n. 7 (juillet 2011). (2011):
- Development of an automated optimizer for sustainable urban landscape design. Dans: Automation in Construction, v. 94 (octobre 2018). (2018):