-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1994): Evaluating performance potential in the selection of construction contractors. Dans: Engineering, Construction and Architectural Management, v. 1, n. 1 (janvier 1994).
https://doi.org/10.1108/eb020991
-
Edwards, David J. / Holt, Gary D. (2000): ESTIVATE: a model for calculating excavator productivity and output costs. Dans: Engineering, Construction and Architectural Management, v. 7, n. 1 (janvier 2000).
https://doi.org/10.1108/eb021132
-
Edwards, David J. / Holt, Gary D. (2010): Case study analysis of construction excavator H&S overturn incidents. Dans: Engineering, Construction and Architectural Management, v. 17, n. 5 (septembre 2010).
https://doi.org/10.1108/09699981011074583
-
Holt, Gary D. / Goulding, Jack Steven / Akintoye, Akintola (2016): Enablers, challenges and relationships between research impact and theory generation. Dans: Engineering, Construction and Architectural Management, v. 23, n. 1 (janvier 2016).
https://doi.org/10.1108/ecam-12-2014-0161
-
Holt, Gary D. (2014): ‘ Ascending the ogive’ – a journal’s analogy with the business life cycle. Dans: Infrastructure Asset Management, v. 1, n. 3 (septembre 2014).
https://doi.org/10.1680/iasma.1.3.55
-
Shehu, Zayyana / Elma, Nurul / Endut, Intan R. / Holt, Gary D. (2014): Factors influencing road infrastructure damage in Malaysia. Dans: Infrastructure Asset Management, v. 1, n. 2 (juin 2014).
https://doi.org/10.1680/iasma.14.00010
-
Owusu‐Manu, De‐Graft / Badu, Edward / Edwards, David J. / Adesi, Michael / Holt, Gary D. (2012): Conceptualisation of the consultancy pricing paradox. Dans: Structural Survey, v. 30, n. 4 (août 2012).
https://doi.org/10.1108/02630801211256706
-
Holt, Gary D. (1996): Applying cluster analysis to construction contractor classification. Dans: Building and Environment, v. 31, n. 6 (novembre 1996).
https://doi.org/10.1016/0360-1323(96)00028-5
-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1994): Evaluating prequalification criteria in contractor selection. Dans: Building and Environment, v. 29, n. 4 (octobre 1994).
https://doi.org/10.1016/0360-1323(94)90003-5
-
Edwards, David J. / Holt, Gary D. (2007): Construction hand tools: vibration emissions from alternative inserts. Dans: Building Research & Information, v. 35, n. 3 ( 2007).
https://doi.org/10.1080/09613210601002772
-
Edwards, David J. / Holt, Gary D. (2005): Exposure to hand–arm vibration: implications of new statutory requirements. Dans: Building Research & Information, v. 33, n. 3 ( 2005).
https://doi.org/10.1080/09613210500082552
-
Holt, Gary D. (1997): Classifying construction contractors. Dans: Building Research & Information, v. 25, n. 6 ( 1997).
https://doi.org/10.1080/096132197370200
-
Edwards, David J. / Shaw, Tony / Holt, Gary D. (1996): Electronic document management systems and the management of UK construction projects. Investigative research based on literature search and unstructured telephone interviews on electronic document management systems (EDMS) with a range of construction professions. Dans: Building Research & Information, v. 24, n. 5 ( 1996).
https://doi.org/10.1080/09613219608727544
-
Owusu-Manu, De-Graft / Holt, Gary D. / Edwards, David J. / Badu, Edward (2014): Determinants of trade credit supply among the Ghanaian construction sector. Dans: Built Environment Project and Asset Management, v. 4, n. 4 (septembre 2014).
https://doi.org/10.1108/bepam-11-2013-0057
-
Shehu, Zayyana / Holt, Gary D. / Endut, Intan R. / Akintoye, Akintola (2015): Analysis of characteristics affecting completion time for Malaysian construction projects. Dans: Built Environment Project and Asset Management, v. 5, n. 1 (février 2015).
https://doi.org/10.1108/bepam-10-2013-0056
-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1995): Application of an alternative contractor selection model. This paper reports on initial results from the application to real‐life of a selection of exercises of an alternative selection model designed to rationalize and simultaneously broaden the scope of this often onerous task. Dans: Building Research & Information, v. 23, n. 5 ( 1995).
https://doi.org/10.1080/09613219508727473
-
Ofori-Boadu, Andrea N. / Shofoluwe, Musibau A. / Owusu-Manu, De-Graft / Holt, Gary D. / Edwards, David (2015): Analysis of US commercial buildings’ energy efficiency programs. Dans: Built Environment Project and Asset Management, v. 5, n. 4 (septembre 2015).
https://doi.org/10.1108/bepam-03-2014-0015
-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1993): A conceptual alternative to current tendering practice. Majority of UK construction projects assigned by way of selective competition, an alternative quantitative selection technique has been developed by the authors which could equally apply elsewhere. Dans: Building Research & Information, v. 21, n. 3 ( 1993).
https://doi.org/10.1080/09613219308727284
-
Owusu-Manu, De-Graft / Badu, Edward / Holt, Gary D. / Edwards, David (2015): Determinants of Management Innovation in the Ghanaian Construction Consulting Sector. Dans: Construction Economics and Building, v. 15, n. 1 (mars 2015).
https://doi.org/10.5130/ajceb.v15i1.4170
-
Holt, Gary D. (2015): British construction business 1700-2000: proactive innovation or reactive evolution?. Dans: Construction Innovation, v. 15, n. 3 (juillet 2015).
https://doi.org/10.1108/ci-02-2014-0016
-
Holt, Gary D. (2014): Asking questions, analysing answers: relative importance revisited. Dans: Construction Innovation, v. 14, n. 1 (janvier 2014).
https://doi.org/10.1108/ci-06-2012-0035
-
Holt, Gary D. (2013): Construction business failure: conceptual synthesis of causal agents. Dans: Construction Innovation, v. 13, n. 1 (janvier 2013).
https://doi.org/10.1108/14714171311296057
-
Edwards, David J. / Holt, Gary D. (2010): The case for "3D triangulation" when applied to construction management research. Dans: Construction Innovation, v. 10, n. 1 (janvier 2010).
https://doi.org/10.1108/14714171011018292
-
Badu, Edward / Owusu-Manu, De-Graft / Edwards, David J. / Holt, Gary D. (2013): Analysis of Strategic Issues Underpinning the Innovative Financing of Infrastructure within Developing Countries. Dans: Journal of Construction Engineering and Management, v. 139, n. 6 (juin 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000641
-
Edwards, David J. / Holt, Gary D. (2010): Case study analysis of risk from using excavators as 'cranes'. Dans: Automation in Construction, v. 19, n. 2 (mars 2010).
https://doi.org/10.1016/j.autcon.2009.12.013
-
Edwards, David J. / Holt, Gary D. (2010): Analysis of hand–arm vibration risk to highway utilities maintenance and repair operatives. Dans: Automation in Construction, v. 19, n. 5 (août 2010).
https://doi.org/10.1016/j.autcon.2010.02.002
-
Holt, Gary D. / Edwards, David J. (2013): Analysis of United Kingdom Off-Highway Construction Machinery Market and Its Consumers Using New-Sales Data. Dans: Journal of Construction Engineering and Management, v. 139, n. 5 (mai 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000584
-
Edwards, David J. / Holt, Gary D. / Harris, Frank C. (2000): Estimating life cycle plant maintenance costs. Dans: Construction Management and Economics, v. 18, n. 4 (juin 2000).
https://doi.org/10.1080/01446190050024842
-
Kaming, Peter F. / Olomolaiye, Paul O. / Holt, Gary D. / Harris, Frank C. (1997): Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Dans: Construction Management and Economics, v. 15, n. 1 (janvier 1997).
https://doi.org/10.1080/014461997373132
-
Edwards, David J. / Holt, Gary D. (2014): Antecedents of Health and Safety Issues Relating to Plant Trailer Wheels. Dans: Journal of Construction Engineering and Management, v. 140, n. 7 (juillet 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000869