-
Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1998): A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Dans: Engineering, Construction and Architectural Management, v. 5, n. 2 (février 1998).
https://doi.org/10.1108/eb021072
-
Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1998): A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Dans: Engineering, Construction and Architectural Management, v. 5, n. 4 (avril 1998).
https://doi.org/10.1108/eb021088
-
Nicholas, J. / Holt, G. D. / Mihsein, M. (2000): Forecasting construction materials suppliers' financial turnover. Dans: Engineering, Construction and Architectural Management, v. 7, n. 3 (mars 2000).
https://doi.org/10.1108/eb021147
-
Sonmez, M. / Yang, J. B. / Holt, G. D. (2001): Addressing the contractor selection problem using an evidential reasoning approach. Dans: Engineering, Construction and Architectural Management, v. 8, n. 3 (mars 2001).
https://doi.org/10.1108/eb021182
-
Wong, C. H. / Nicholas, J. / Holt, G. D. (2003): Using multivariate techniques for developing contractor classification models. Dans: Engineering, Construction and Architectural Management, v. 10, n. 2 (avril 2003).
https://doi.org/10.1108/09699980310466587
-
Carmichael, R. / Edwards, D. J. / Holt, G. D. (2007): Plant managers' perceptions of plant security systems. Dans: Engineering, Construction and Architectural Management, v. 14, n. 1 (janvier 2007).
https://doi.org/10.1108/09699980710716981
-
Nicholas, J. / Holt, G. D. / Proverbs, D. G. (2001): Towards standardising the assessment of flood damaged properties in the UK. Dans: Structural Survey, v. 19, n. 4 (octobre 2001).
https://doi.org/10.1108/02630800110406667
-
Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1998): A comparative evaluation of planning engineers' formwork productivity rates in European construction. Dans: Building and Environment, v. 33, n. 4 (juillet 1998).
https://doi.org/10.1016/s0360-1323(97)00035-8
-
Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1998): Factors impacting construction project duration: a comparison between France, Germany and the U.K.. Dans: Building and Environment, v. 34, n. 2 (mars 1998).
https://doi.org/10.1016/s0360-1323(98)00004-3
-
Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1998): A method for estimating labour requirements and costs for international construction projects at inception. Dans: Building and Environment, v. 34, n. 1 (janvier 1998).
https://doi.org/10.1016/s0360-1323(97)00064-4
-
Zakeri, M. / Olomolaiye, P. / Holt, G. D. / Harris, F. C. (1997): Factors affecting the motivation of Iranian construction operatives. Dans: Building and Environment, v. 32, n. 2 (mars 1997).
https://doi.org/10.1016/s0360-1323(96)00044-3
-
Sonmez, M. / Holt, G. D. / Yang, J. B. / Graham, G. (2002): Applying Evidential Reasoning to Prequalifying Construction Contractors. Dans: Journal of Management in Engineering (ASCE), v. 18, n. 3 (juillet 2002).
https://doi.org/10.1061/(asce)0742-597x(2002)18:3(111)
-
Nicholas, J. / Holt, G. D. / Harris, P. T. (2000): Suppliers' debt collection and contractor creditworthiness evaluation. Dans: Building Research & Information, v. 28, n. 4 ( 2000).
https://doi.org/10.1080/09613210050073724
-
Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1999): Factors in formwork selection: a comparative investigation. Dans: Building Research & Information, v. 27, n. 2 ( 1999).
https://doi.org/10.1080/096132199369570
-
Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1997): Factors influencing the choice of concrete supply methods. Dans: Building Research & Information, v. 25, n. 3 ( 1997).
https://doi.org/10.1080/096132197370444
-
Holt, G. D. / Olomolaiye, P. O. / Harris, F. C. (1994): Incorporating project specific criteria and client utility into the evaluation of construction tenderers. Choice of contractor should be made on a value‐for‐money basis, rather than automatically accepting the lowest bid, the aim should be to accept the best tender. This paper helps selection contractors broaden their analysis. Dans: Building Research & Information, v. 22, n. 4 ( 1994).
https://doi.org/10.1080/09613219408727384
-
Chen, J. F. / Yang, Z. J. / Holt, G. D. (2001): FRP or steel plate-to-concrete bonded joints: Effect of test methods on experimental bond strength. Dans: Steel and Composite Structures, v. 1, n. 2 (juin 2001).
https://doi.org/10.12989/scs.2001.1.2.231
-
Yang, Z. J. / Chen, J. F. / Holt, G. D. (2001): Efficient evaluation of stress intensity factors using virtual crack extension technique. Dans: Computers & Structures, v. 79, n. 31 (décembre 2001).
https://doi.org/10.1016/s0045-7949(01)00146-8
-
Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1998): Scaffolding for high-rise concrete construction: A French, German and UK comparison. Dans: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 128, n. 1 (février 1998).
https://doi.org/10.1680/istbu.1998.30035
-
Zhang, P. / Harris, F. C. / Olomolaiye, P. O. / Holt, G. D. (1999): Location Optimization for a Group of Tower Cranes. Dans: Journal of Construction Engineering and Management, v. 125, n. 2 (mars 1999).
https://doi.org/10.1061/(asce)0733-9364(1999)125:2(115)
-
Nicholas, J. / Holt, G. D. / Mihsein, M. (2000): Contractor financial credit limits; their derivation and implications for materials suppliers. Dans: Construction Management and Economics, v. 18, n. 5 (juillet 2000).
https://doi.org/10.1080/014461900407347
-
Proverbs, D. G. / Holt, G. D. (2000): A theoretical model for optimum project (time) performance based on European best practice. Dans: Construction Management and Economics, v. 18, n. 6 (septembre 2000).
https://doi.org/10.1080/014461900414718
-
Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1999): Productivity rates and construction methods for high rise concrete construction: a comparative evaluation of UK, German and French contractors. Dans: Construction Management and Economics, v. 17, n. 1 (janvier 1999).
https://doi.org/10.1080/014461999371817
-
Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1999): European construction contractors: a productivity appraisal of in situ concrete operations. Dans: Construction Management and Economics, v. 17, n. 2 (mars 1999).
https://doi.org/10.1080/014461999371727
-
Proverbs, D. G. / Holt, G. D. / Olomolaiye, P. O. (1999): Construction resource/method factors influencing productivity for high rise concrete construction. Dans: Construction Management and Economics, v. 17, n. 5 (septembre 1999).
https://doi.org/10.1080/014461999371196