Ian Hodgson
- Distortion-Induced Fatigue Cracking after Crack Arrest Hole Retrofit of Steel Girder Bridges. Dans: Journal of Bridge Engineering (ASCE), v. 28, n. 6 (juin 2023). (2023):
- Full-Scale Fatigue Tests of a New Rib-to-Floor Beam Connection for Orthotropic Steel Decks. Dans: Journal of Bridge Engineering (ASCE), v. 27, n. 10 (octobre 2022). (2022):
- Finite-Element Fatigue Analysis of a New Rib-to-Floor Beam Connection for Orthotropic Steel Decks. Dans: Journal of Bridge Engineering (ASCE), v. 26, n. 2 (février 2021). (2021):
- Application of state-of-the-art in measurement and data analysis techniques for vibration evaluation of a tall building. Dans: Structure and Infrastructure Engineering, v. 10, n. 5 (mars 2014). (2014):
- Rigid-bolted repair method for damaged moment connections. Dans: Engineering Structures, v. 20, n. 4-6 (avril 1998). (1998):
- Forensic Examination of a Noncomposite Adjacent Precast Prestressed Concrete Box Beam Bridge. Dans: Journal of Bridge Engineering (ASCE), v. 15, n. 4 (juillet 2010). (2010):
- Development of Flexural Strength Rating Procedures for Adjacent Prestressed Concrete Box Girder Bridges. Dans: Journal of Bridge Engineering (ASCE), v. 16, n. 5 (septembre 2011). (2011):