Thomas Herzfeld
- Vienna Underground, Neubaugasse Station – Preparatory works and challenges on the surface. Dans: Geomechanics and Tunnelling, v. 12, n. 5 (octobre 2019). (2019):
- new line crossing U2/U5 of the Vienna subway. Dans: Geomechanics and Tunnelling, v. 10, n. 4 (août 2017). (2017):
- Construction section U1/10 of the Vienna Underground / Der Bauabschnitt U1/10 der Wiener U-Bahn. Dans: Geomechanics and Tunnelling, v. 7, n. 3 ( 2014). (2014):