Ulrich (Rick) Hermann
- Evaluating Mobile Crane Lift Operations Using an Interactive Virtual Reality System. Dans: Journal of Construction Engineering and Management, v. 147, n. 11 (novembre 2021). (2021):
- Evaluating industrial modularization strategies: Local vs. overseas fabrication. Dans: Automation in Construction, v. 114 (juin 2020). (2020):
- 3D Visualization-Based Motion Planning of Mobile Crane Operations in Heavy Industrial Projects. Dans: Journal of Computing in Civil Engineering, v. 30, n. 1 (janvier 2016). (2016):
- Automating motion trajectory Of crane-lifted loads. Dans: Automation in Construction, v. 45 (septembre 2014). (2014):
- A simulation-based method for effective workface planning of industrial construction projects. Dans: Construction Management and Economics, v. 36, n. 6 (octobre 2017). (2017):
- 3D-Based Crane Evaluation System for Mobile Crane Operation Selection on Modular-Based Heavy Construction Sites. Dans: Journal of Construction Engineering and Management, v. 143, n. 9 (septembre 2017). (2017):