J. Hassanpour
- Developing new equations for TBM performance prediction in carbonate-argillaceous rocks: a case history of Nowsood water conveyance tunnel. Dans: Geomechanics and Geoengineering, v. 4, n. 4 (27 novembre 2009). (2009):
- Predicting TBM performance in soft sedimentary rocks, case study of Zagros mountains water tunnel projects. Dans: Tunnelling and Underground Space Technology, v. 109 (mars 2021). (2021):
- Evaluation of common TBM performance prediction models based on field data from the second lot of Zagros water conveyance tunnel (ZWCT2). Dans: Tunnelling and Underground Space Technology, v. 52 (février 2016). (2016):
- Introduction of an empirical TBM cutter wear prediction model for pyroclastic and mafic igneous rocks; a case history of Karaj water conveyance tunnel, Iran. Dans: Tunnelling and Underground Space Technology, v. 43 (juillet 2014). (2014):
- A new hard rock TBM performance prediction model for project planning. Dans: Tunnelling and Underground Space Technology, v. 26, n. 5 (septembre 2011). (2011):