- Automated prioritization of construction project requirements using machine learning and fuzzy Failure Mode and Effects Analysis (FMEA). Dans: Automation in Construction, v. 154 (octobre 2023). (2023):
- Automated Approach for Digitalizing Scope of Work Requirements to Support Contract Management. Dans: Journal of Construction Engineering and Management, v. 149, n. 4 (avril 2023). (2023):
- Ontology-Based Approach to Risk-Factor Identification to Support the Management of Provisions in Bridge Design. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 1 (février 2023). (2023):
- Addressing Legal and Contractual Matters in Construction Using Natural Language Processing: A Critical Review. Dans: Journal of Construction Engineering and Management, v. 147, n. 9 (septembre 2021). (2021):
- Automated Requirements Identification from Construction Contract Documents Using Natural Language Processing. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 2 (mai 2020). (2020):
- Computer-assisted separation of design-build contract requirements to support subcontract drafting. Dans: Automation in Construction, v. 122 (février 2021). (2021):